Project Overview:

BOTHX delivered a Rapid-Deployment cleanroom solution for a U.S.-based electronics manufacturer.
The project was executed within an existing production facility, representing a typical brownfield retrofit scenario with stringent requirements on schedule, operational continuity, and regulatory compliance.

Project Challenges:
  • Limited site conditions within an operating facility
  • Tight timeline with a clear production start-up target
  • Full compliance with U.S. codes and standards
  • High certainty required for cross-border project execution
Project Solution:

BOTHX implemented its Rapid-Deployment Cleanroom Solution, completing design, fabrication, pre-assembly, installation, commissioning, and testing entirely in China.

Through standardized and modular design, critical activities were front-loaded and executed in a controlled manufacturing environment, enabling efficient and predictable delivery.

Project Results:
  • Significantly reduced on-site construction and commissioning time
  • Lower execution risk for overseas installation
  • Rapid upgrade of cleanroom environment within an existing facility
  • Full compliance with U.S. and international standards
Client Value:

The project demonstrates BOTHX’s proven capability in international delivery, Rapid-Deployment cleanroom engineering, and compliance-driven execution, providing a scalable and repeatable solution for overseas facility retrofits and capacity expansion.